Technical details
| Type |
Cable management kit |
PT-CL01 - Cable-Management Kit
- (For Lian Li 2009 model) Insert the cable clamp into specific mounting point
- (For non Lian Li 2009 model) Remove the holders, place the double-side tape at the base of cable clamp, and stick it to suit.